Navigation
Repair/replacement of warehouse swinging doors black seal
Latest photo unknown • 0 photos
TDD Structural Inspection covering: mend damaged street side roof gutters | repair impact damage to metal facade | mend plaster damages on wall | substitute damaged metal facade elements | improve water seal and mend moisture plaster damages | repair vertical wall crack over freezer | remove mulch at logo pole fixings | substitute damaged barrier.
Latest photo unknown • 0 photos
Perform a structural TDD inspection and complete maintenance: substitute corroded metal sheets near ventilation pipes; replace/fix slipped roof tiles; clean extension roof gutters and rainpipes; replace/fix deformed metal ceiling sheet over entry; substitute damaged eave cladding; mend damaged plaster and add impact protection; substitute ceiling panel with water stain.
Latest photo unknown • 0 photos
Brixton fence
Latest photo unknown • 0 photos
Remove and Replace Carpark Fire Exit Door
Latest photo unknown • 0 photos
ERP PROJECT: SCO Install and checkout configuration. Includes bakery oven relocation to warehouse, floor tile replacement (20cm flakes), packing bench adjustments, making good including window mullions, and oven relocation with plumbing and making good of wall on shopfloor.
Latest photo unknown • 0 photos
Drains and inspection chambers repair - Inpection chamber cover damaged
Latest photo unknown • 0 photos
Replace damaged shop floor tiles and paint trunking above chiller to match blue wall
Latest photo unknown • 0 photos
Delivery door roller shutter door stuck - shutter has come off on the right hand side and can not close
Latest photo unknown • 0 photos
1036 Mitcham - 216-218 Rowan Road, Mitcham, London, SW16 5HX
Latest photo unknown • 0 photos
1352 Mitcham Town Centre - 9-17 Western Road, Mitcham, Surrey, CR4 3ED
Latest photo unknown • 0 photos
671 Wallington - 16-18 Beddington Gardens, Wallington, Surrey, SM6 0HU
Latest photo unknown • 0 photos
1387 Croydon Church Street - 68-74 Church Street, Croydon, Surrey, CR0 1RB (parking at the back of the store - access from Firth Road)
Latest photo unknown • 0 photos
Repair of damaged single steel warehouse fire exit door
Latest photo unknown • 0 photos
ERP Mop Up Works
Latest photo unknown • 0 photos
Need to re-attend for continuing works from Hyrgen & Jason PO. Need to call before attending to ensure access can be given. Previous work done under PO: 622659739
Latest photo unknown • 0 photos
ERP Project Works - Night 1: Walls needs painting
Latest photo unknown • 0 photos
ERP Project Works - Needs painting of walls - ERP Project - Night 1
Latest photo unknown • 0 photos
unsure if it is due to driver reversing into. recently fixed but now metal is hanging down. i have added picture of broken side (left) snd normal side (right)
Latest photo unknown • 0 photos
TDD Structural Inspection: Substitute metal corroded decking sheets (2.1.2, 2.1.3), substitute metal cover (2.1.4), mend air conditioner pipe or improve insulation and substitute spoiled ceiling panels (2.6.2), substitute damaged barrier (2.8.3), mend boundary wall and place barriers (2.8.4), and mend retaining ramp wall (2.8.5).
Latest photo unknown • 0 photos
Repair roof leaks causing damp patches on ceiling panels and dripping water
Latest photo unknown • 0 photos
Lidl Store Union Street 37, BS1 2DS Bristol Investigate roof leak
Latest photo unknown • 0 photos
Complete all floor tiling reinstatement following checkout removal and completion of Sco installation
Latest photo unknown • 0 photos
ERP ProjectRemerch Support - Team 2: 3no Dayshifts. Works to include Floor Tiling repairs (20cm Flake), Packing bench repairs and making good, Boxing in of 1st aisle window for bakery arch install, bakery oven relocation to warehouse, incl plumbing, Any reasonable request by remerch team leader
Latest photo unknown • 0 photos
Post project ERP works - Walls damage repair
Latest photo unknown • 0 photos
ERP ProjectRemerch Support - 4no Nightshifts. Works include: Floor Tiling repairs (20cm Flake), Packing bench repairs and making good, Boxing in of 1st aisle window for bakery arch install, bakery oven relocation to warehouse (incl. plumbing), and any reasonable request by remerch team leader.
Latest photo unknown • 0 photos
Install ventilation into new Bakery Prep area in Warehouse / redecorate Welfare/SF door / replace urinal in Staff toilet.
Latest photo unknown • 0 photos
Cherry Picker support-Refrigeration PPM
Latest photo unknown • 0 photos
Chiller maintenance: Mechanical damage [Prio 2C] - Hauser 3 Bay F&V Chiller (2.04m) (R290) - PPM Support- Chiller PPM / Cherry picker support
Latest photo unknown • 0 photos
Project Code 63100527GB50: Attendance is needed for remerch support. Arrive at the store ready to start work and signed in by 19.00. Additional instructions and guidance will be given by the Remerch team leader. Work may include replacing damaged floor tiles, removing a packing bench section, installing new wall sections, skirting boards, and general making good after refurbishment works.
Latest photo unknown • 0 photos